Driveways and Crossovers: Central Coast Council Requirements

Central Coast Concrete Revival is an independent referral service and does not perform or contract for the advertised work. Your enquiry may be referred to an independent contractor. Where licensing is required, the contractor's identity and licence details will be provided before you accept a quotation or enter a contract.

Central Coast Council calls the crossover a Vehicle Access Crossing (VAC): the part of the driveway that crosses the nature strip from the road to the property boundary. Approval must be obtained from Council “to construct a new or alter and maintain existing VAC”, whether or not the street has kerb and gutter (Central Coast Council, VAC). The crossing is built to Council’s Civil Works Specification, which allows only plain concrete on residential crossings, and the owner maintains it.

This site is a referral service and does no work itself. Council’s own pages are the authority; check them, or ask Council, before work starts on the verge.

Understanding the terminology

  • Driveway: the vehicle access inside the property. Council’s design guideline defines it as the part of an access that is “completely within” the land (Civil Works Specification, Design Guideline 2026).
  • Crossover (VAC): the part that crosses the footway or verge and connects the road to the driveway. It sits in the road reserve, which is why the NSW Roads Act 1993 requires Council consent for work on it (Central Coast Council, VAC).
  • Kerb layback (kerb cut): the lowered section of kerb at the road edge. Council’s construction specification says that where a new gutter crossing and layback are needed, the existing kerb and gutter is removed and rebuilt to its specification (Civil Works Specification, Construction Specification 2026).

What needs Council approval

Council’s VAC page says an application is needed to “construct/re-construct/modify” a crossing (Central Coast Council, VAC). In practice that covers:

  • a new crossing where none exists
  • widening, moving or rebuilding an existing crossing
  • resurfacing or recoating the crossing, which is altering it
  • a second crossing to the same property (see below)

Two points catch people out. A development consent, complying development certificate or construction certificate “is not approval to construct a VAC”; a separate VAC approval is still needed. And where access is from a Crown road or a State road such as the Pacific Highway or Central Coast Highway, the owner must first get written approval from the State authority and submit it with the application to Council (same page).

Nothing on Council’s VAC page addresses resurfacing the driveway inside the boundary, and this site does not state a rule either way. The council and planning approval guide covers what else can apply.

Central Coast Council’s crossover standards

Plain concrete only on residential crossings

Council’s construction specification says it “only permits” crossings in the road reserve in plain concrete with a durable, slip-resistant finish and no trip hazards. It does not permit crossings in pavers, tiles, uneven stamped concrete or exposed aggregate in urban residential, rural or industrial areas (Construction Specification 2026, section 10.2.5). The finish is steel floated then broomed across the direction of travel, and an expansion joint goes at the property boundary.

For a decorative driveway resurfacing job, that usually means the coating stops at the boundary. The specification does not mention spray-on coatings by name, so ask Council before including the crossing in any decorative finish.

Widths, grades and placement

Council’s design guideline says residential crossings are designed to AS/NZS 2890.1 (off-street car parking) and Council’s Standard Drawings, which set the grades and layout (Design Guideline 2026, section 9.2). The design must consider the road type, drainage, services and closeness to intersections, other accesses, street furniture and street trees. Where a roll top kerb has been provided, the guideline allows “no provision or modification” for a crossing. Exact widths and grades are on the Standard Drawings, linked from Council’s Civil Works Specification page.

Drainage

The same guideline says driveway runoff “is not permitted to flow onto any footpath, shared path or carriageway”, and the crossing includes gutter and path crossings to the Standard Drawings (Design Guideline 2026).

Secondary crossings

Council “typically does not allow” a second crossing. It may be considered only where the property has more than 20 metres of street frontage, is on a corner block, or needs a second access for significant safety reasons (Central Coast Council, VAC).

The VAC application process

  1. Apply online. Crossings for existing homes and new single or secondary dwellings are lodged through Council’s Online Services with the VAC application form, drawings and fees (Central Coast Council, VAC).
  2. Pay the fees. Central Coast Council’s 2026/27 fees list a standard VAC application at $338.50 and an inspection at $271.95; a non-standard crossing needing engineering plans is assessed for $496.30. Starting work without approval adds $605.90 on top of the standard fees (Fees and Charges 2026-27, fees 1829, 1830, 1831 and 1841).
  3. Wait for approval. Council says a straightforward application “will usually be processed within 14 to 21 days”; allow 28 days if a site-specific design is needed (Central Coast Council, VAC).
  4. Build to the approval. The work is built to the approved drawings and Council’s specification. Concrete repairing and resurfacing are general concreting work, which needs a NSW contractor licence above $5,000 including GST (NSW Government, General concreting work).

The concrete resurfacing cost guide shows how these fees sit alongside published resurfacing prices.

New estates

In new subdivisions the crossing is often built as part of the estate or the house build. The same rules then apply to any later change: altering the crossing needs VAC approval, and the development consent for the house is not that approval (Central Coast Council, VAC). Estate design guidelines or covenants can also limit driveway materials or colours; check the contract of sale. The new driveway sealing page covers sealing a new driveway inside the boundary.

Steep driveways

On steep sites Council may ask for a site-specific design. Its design guideline describes a “non-standard” crossing as one that cannot meet AS/NZS 2890.1 and the Standard Drawings because of the site, and says such crossings “are not recommended” and may need survey plans and certification from a civil or structural engineer (Design Guideline 2026). Where grades are steep and a site-specific design has been done, the construction specification allows a tyned or grooved surface for more skid resistance. The steep driveway finishes guide covers the private section.

FAQs

How long does a crossing permit take to approve?

Central Coast Council says a straightforward VAC application is usually processed within 14 to 21 days, or about 28 days where a site-specific design is needed (Central Coast Council, VAC). Council notes these are average times only.

Who constructs the kerb cut?

Council’s page describes an approval the property owner applies for, followed by construction to Council’s Standard Drawings and specification, and its fee schedule includes an inspection fee. Ask Council when applying who may carry out the kerb and gutter work on that street. Council builds crossings in plain concrete at no cost to the owner only during its own road upgrade projects (Construction Specification 2026).

Can I widen my driveway to allow two cars to enter side by side?

Widening the crossing is altering it, so it needs VAC approval, and the width must fit Council’s Standard Drawings. A second, separate crossing is only considered for frontages over 20 metres, corner blocks or significant safety concerns (Central Coast Council, VAC).

Can the crossover be resurfaced to match my decorative driveway?

Council’s specification permits residential crossings in plain concrete only, and rules out pavers, tiles, uneven stamped concrete and exposed aggregate (Construction Specification 2026). Ask Council before any coating goes past the boundary.

My existing crossover is in poor condition: who’s responsible for repairing it?

The property owner. Council’s VAC page says maintenance of a crossing and its supporting structures “is the property owner’s responsibility under the Roads Act”, and repairs or rebuilding still need approval (Central Coast Council, VAC).

Request a quote

Sources

Last reviewed 16/11/2026. How these pages are researched and corrected.

More guides

Drummy, Hollow-Sounding Concrete: What It Means

Concrete that sounds hollow or drummy when tapped: what the sound means, what causes it, and when it is a routine…

View

Efflorescence on Driveways: Cause and Treatment

White powder on a concrete driveway is usually efflorescence: what causes it, when it fades on its own, how to remove…

View

Epoxy Garage Floor Cost per Square Metre in Australia

Epoxy garage floor cost per m² in Australia: hipages' published rates by system and garage size, why grinding and…

View

More on this topic

Request a quote

Tell us about the job and an independent local contractor can quote it.

Get a Quote