In a NSW strata scheme, a shared driveway, path or common courtyard is usually common property, and the owners corporation (often still called the body corporate) must repair and maintain it. Resurfacing that concrete is the owners corporation’s decision and expense, made through the strata committee or a general meeting and paid from levies, usually the capital works fund for larger jobs.
Who is responsible
The NSW Government’s strata guidance says “The owners corporation or strata committee must repair and maintain common property”, while owners are responsible for repairs inside their own lot (NSW Government, Strata repairs and maintenance). Whether a particular driveway, car space or courtyard is common property or part of a lot depends on the strata plan and any by-laws, so check those first. A car space or courtyard shown as part of a lot can be the owner’s to maintain; the shared driveway leading to it usually is not.
How the work gets approved
The steps below are the usual path; the scheme’s by-laws and the committee’s delegations set the detail.
- Put it in writing. A lot owner writes to the strata committee or managing agent describing the problem, with photos, and flags any trip or slip hazard clearly.
- Get comparable quotes. Ask each contractor to quote the same scope: areas in m², preparation method, repairs, finish, sealer and staging.
- Decide at the right level. The committee may be able to approve within its delegation; larger spending, or a special levy, goes to a general meeting.
- Record it. Keep the quotes, resolution, contract and warranty terms with the scheme’s records.
Upgrades are different from repairs. Changing the look or function of common property, rather than maintaining it, can need a resolution under the scheme’s renovation rules, and “any owners affected by changes to common property need to agree to the changes in writing” (NSW Government, Strata renovations). A lot owner resurfacing their own courtyard needs to check whether it is cosmetic work, a minor renovation or a major renovation under those rules before booking anyone.
How it is funded
“The capital works fund (also known as the sinking fund) is used to pay for major repairs and maintenance”, it is funded by levies, and the owners corporation must keep a 10-year capital works plan (NSW Government, Strata repairs and maintenance). Resurfacing a shared driveway or car park belongs in that plan. If the fund falls short, a special levy on owners may be needed, which is decided at a general meeting.
For newer buildings, check before paying for repairs whether the cracking or surface failure is a building defect the builder or developer should fix. The same NSW Government page notes that the Residential Apartment Buildings Act 2020 contains powers that may help get serious defects fixed.
What to put in a strata scope
- Each area separately: driveway, car park, paths, steps, pool surround, with measured areas.
- Staging and access. Residents still need to get in and out. Doing the work in halves, or over agreed days, should be in the quote, with notice to residents; the staged resurfacing guide explains how staging works.
- Grip. For steps, ramps and pool areas, ask for the finish’s AS 4586 wet classification (Standards Australia, AS 4586-2013), the standard for new surface materials.
- Dust and slurry. SafeWork NSW treats grinding concrete as “processing” that must be controlled, for example by wet methods or on-tool extraction (SafeWork NSW code of practice, February 2026). Slurry must stay out of drains: polluting waters is an offence under the POEO Act (NSW EPA).
- The crossing. If the work includes the strip of driveway between the property boundary and the road, Central Coast Council approval is needed to alter that vehicle access crossing (Central Coast Council, VAC).
- Paperwork. Contractor licence for the class of work, written contract, and the contractor’s and manufacturer’s warranty terms in writing; the warranty guide covers what to check.
This site’s referral service covers residential concrete restoration. Large basement car parks and commercial floor systems are specialist work outside its scope.
What drives the cost
Area, the amount of repair and preparation, the finish, staging around residents, and any council crossing work. Published resurfacing ranges are in the cost guide, and the process for a shared driveway is on the driveway resurfacing page and, for a clean and reseal, the grinding and sealing page. No publisher gives a strata-specific price.
NSW contract rules apply to strata work as to any home building work over $5,000: a written contract, a deposit of no more than 10%, and Home Building Compensation cover for residential work over $20,000 (NSW Government, Contracts). Whether a given strata job needs that cover depends on the building and the work, so ask the strata manager or contractor to confirm.
FAQs
The common driveway is a hazard and the committee will not act. What can an owner do?
Put the hazard in writing to the committee and managing agent, with photos, and ask for it to go on the agenda of the next general meeting. The NSW Government’s strata guidance says a lot owner may take legal action where the owners corporation failed in its duty to maintain and repair common property, within six years of becoming aware of the loss (NSW Government); get advice before going down that path.
Can a lot owner resurface their own car space?
Only if it is part of their lot under the strata plan, and even then the strata renovation rules may require approval depending on the work. If the car space is common property, it is the owners corporation’s decision.
Should resurfacing be in the capital works plan?
Yes. The owners corporation must keep a 10-year capital works plan, and resurfacing or resealing shared concrete is the kind of major maintenance it is meant to anticipate.
Sources
- NSW Government, Strata repairs and maintenance: owners corporation duty to repair common property, capital works fund and plan, updated 22 June 2026; checked 15/11/2026
- NSW Government, Strata renovations: cosmetic, minor and major renovations and changes to common property, updated 22 June 2026; checked 15/11/2026
- NSW Government, Contracts: written contracts, deposit cap and HBC cover, updated 29 April 2026; checked 15/11/2026
- Standards Australia, AS 4586-2013: slip resistance classification of new pedestrian surface materials; checked 15/11/2026
- SafeWork NSW, Managing risks of respirable crystalline silica, Code of practice (PDF): grinding concrete is controlled “processing”, February 2026; checked 15/11/2026
- NSW EPA, Water pollution: polluting waters is an offence under the POEO Act; checked 15/11/2026
- Central Coast Council, Vehicle Access Crossing (VAC): approval to alter an existing crossing; checked 15/11/2026