A driveway makeover by resurfacing replaces the look of a sound but tired driveway, not the slab itself. Expect a day or two of noisy preparation and application, then several days off the driveway while the sealer cures; the product data sheets, not the finish date, decide when the car goes back on. One resurfacing product maker says a driveway can be “done and dusted in as little as two days” (Dulux Avista), and its sealer sheets then ask for at least 5 days before vehicle traffic.
This site is a referral service and does no work itself. The stages below come from manufacturers’ published instructions; the contractor’s own products and method may differ, so ask for their data sheets.
Before: is the driveway a candidate?
A makeover suits a driveway that is faded, stained, patchy or lightly cracked but solid underfoot. It does not fix a slab that is sinking, rocking or broken into moving pieces, and fine cracks are not guaranteed to stay hidden: the maker of one resurfacing system says it is “a decorative coating and cracks in the concrete base may reflect through the surface” (Dulux Avista Base Compound data sheet). The driveway resurfacing page covers how that call is made.
Before the day: clear the driveway of cars, pots and hoses, tell the contractor about irrigation heads or garden edges, warn neighbours about noise, and plan to park elsewhere for about a week.
During: the stages
Dulux Avista’s data sheet for its spray or trowel resurfacing compound sets out this sequence:
- Clean and prepare. The concrete must be free of grease, oil, paint and curing agents, then pressure cleaned and acid etched “to remove any loosely bound cement and laitance”. Quotes may instead (or also) specify diamond grinding or shot blasting; ask which method is included. Grinding concrete makes silica dust, which SafeWork NSW requires to be controlled with measures such as wet methods or on-tool extraction (SafeWork NSW code of practice, February 2026), so expect the work area to be kept clear of people and pets.
- Mask and tape. Lawns, plants and walls are covered, and expansion joints are taped so they stay open.
- Prime, then apply the colour coats: the sheet calls for a minimum of 2 spray coats. Wet colour looks darker than the finished, dry result.
- Seal once the surface passes a dry test.
Wash water and slurry should be contained, not hosed into the gutter: polluting waters is an offence under the POEO Act (NSW EPA), and Central Coast Council notes that pollution from streets flows “directly to our waterways and the ocean” (Council waterways fact sheet). The resurfacing day guide walks through the day hour by hour.
After: cure times before use
These are one manufacturer’s minimums for its own sealers; the contractor’s product sheets govern:
| After sealing, keep off | Dulux Avista Base Compound sheet | Dulux Avista General Purpose Sealer sheet |
|---|---|---|
| Rain, water, sprinklers | 6 hours | 6 hours |
| Foot traffic | 24 hours | 24 hours |
| Vehicles | 5 days | 5 days above 25°C, 7 days below 25°C |
Sources: Base Compound data sheet; General Purpose Concrete Sealer data sheet. Both say the time depends on weather and coating thickness.
Central Coast weather and scheduling
Product limits set the working window. The Dulux Avista compound should not be applied below 10°C or onto surfaces above 40°C, and its sealer not below 8°C or above 35°C or “if rain is likely” (data sheets above). The Bureau of Meteorology’s Gosford AWS (station 061425, records from 2013) shows a mean January maximum of 28.0°C, a mean July minimum of 7.1°C, and a mean 99.7 days a year with 1 mm or more of rain (BOM). In practice that means early starts or shade on hot summer days, late starts on cold winter mornings, and rain days pushing the job back. Ask how the contractor handles weather delays and whether they cost extra.
What the “after” looks like
A new, even colour and texture across the whole driveway, with old stains covered, joints still open, and a sealed surface that beads water. The spray-on concrete page shows the finish options. Selling soon? The pre-sale resurfacing page covers timing a job around listing photos. Costs are in the cost guide.
Request a quote with a few photos and the driveway’s rough size.
FAQs
When can I drive on a resurfaced driveway?
When the contractor’s sealer data sheet allows. Dulux Avista’s sheets give at least 5 days, or 7 days in cooler weather for its General Purpose sealer, and say traffic readiness depends on conditions.
Will it match the sample colour?
Closely, if the sample is judged dry and sealed, in daylight, on the actual slab. Wet colour looks darker than the finished result.
What if it rains during the job?
Dulux Avista says not to seal “if rain is likely”, and to keep water off a newly sealed surface for at least 6 hours. A contractor should reschedule rather than seal ahead of rain.
Will the cracks come back?
Fine surface cracks are repaired first, but the product maker warns that cracks in the base slab may reflect through. Cracks from a slab that is still moving are a reason to look at replacement instead (see questions to ask a contractor).
Sources
- Dulux Avista, How much can I save by resurfacing my driveway?: product maker’s process and “two days” line; checked 15/11/2026
- Dulux Avista Base Compound data sheet (PDF): preparation, coats, temperature limits and sealer cure times, manufacturer’s technical sheet; checked 15/11/2026
- Dulux Avista General Purpose Concrete Sealer data sheet (PDF): sealing limits and cure times, manufacturer’s technical sheet; checked 15/11/2026
- SafeWork NSW, Managing risks of respirable crystalline silica, code of practice (PDF): dust controls when grinding concrete; checked 15/11/2026
- NSW EPA, Water pollution and Central Coast Council waterways fact sheet (PDF): wash water and stormwater; checked 15/11/2026
- Bureau of Meteorology, Gosford AWS 061425: temperatures and rain days, 2013-2026; checked 15/11/2026